Money Saving Ideas

 
Having the job site ready keeps
your cost down… Plan ahead!
 
  • The crane needs a leveled area, approximately 30’X 40’, as close to the job as possible, in most circumstances.
  • Move objects out of the way including job trailers and materials that might become an obstacle when setting up the crane.
  • When doing trusses have your layout marked, braces and spacers ready.
  • Tag lines are supplied. Have someone dedicated to the tag line, if possible.
  • Do not position job materials to be lifted under or near power lines. If power lines are going to be an issue, call ahead, so arrangements can be made.
  • Leach fields, septic tanks or some sidewalks should not be driven over, therefore, plan ahead.
  • Clear directions to job site helps in your port-to-port cost.